Preparation a Second Story Addition

Posted on: August 22, 2021 by in Uncategorized
No Comments

Preparation a Second Story Addition

When handling a task that consists of removing your roof, Planning is the trick.
Prior to you prepare your 2nd story, research study what barriers will need to be managed. Examples of items that need to be taken care of are:
– Size of ceiling joists, can they support a 2nd story floor covering?
– Are mechanicals run over the top of existing ceiling joists? (pipelines, electRic, HVAC).
– How much overhang is on existing roof and exist any energies protected to it.
– Is the existing roof stick built( established on site) or a truss roof( made).
– Is the roof sheathing 1x boards or plywood?
– How great deals of layers of shingles exist?
– Are there any Stacks or flues extending through the roof such as a fireplace chimney, heater flue, or vent pipeline.
These things need to be thought of so the addition can be established as quickly as possible.
When starting the tearoff, the really first thing that needs to be addressedis the soffit. When it comes time to remove them, removing this at first will launch up the rafter ends.
Now you can tearoff the roof. The most hassle-free technique to get rid of the shingles and sheathing is with a circular saw. Because it will be trash when you are done, it’s finest to use an old blade with a lower amount off teeth.
When cutting the roof away, start at the ridgeboard and run the saw in between the rafters all the approach to the rafter tails. Repeat this cut every 32″ from one end of the roof to the other. These pieces, presuming they are plywood, can be removed in 32″ x 48″ squares.
If the roof sheathing is pieces, the cuts require to be made 48″ to 64″ apart. If there are 2 or mre layers of shingles, you require to be able to roll these locations down the rafters.
When the roof sheathing is removed, the remainder of the aspects canbe eliminated. When that is gone the rafters can be eliminated.
After the sheathing is eliminated, a number of the truss work will need to be eliminated. The only part left would be the bottom cable television that holds up the drywall ceiling. Each situation is numerous and what is used is spect by an engineer or designer.
The electrical (opportunity), pipelines and/or HVAC run over the top of the ceiling joists. Normally, the easiest approach to handle this, is to establish a knee wall high enough for the new floor covering joists to clear these obstructions.
As quickly as the deck is down, the walls, ceiling joists, and roof of your new addition can follow.
Whatever situation might you have, outstanding preparation will make this taskeasier and quicker. Time is of the essence when it comes to getting rid of a roof. You want to secure the existing structure and all of your crucial possesions that are left within.
( c) 2005 Mike Merisko www.sawkerfs.com.

As quickly as the roof sheathing is gotten rid of, the rest of the aspects canbe removed. Time is of the essence when it comes to getting rid of a roof.

When cutting the roof away, start at the ridgeboard and run the saw in between the rafters all the technique to the rafter tails. Repeat this cut every 32″ from one end of the roof to the other. When it comes to getting rid of a roof, Time is of the essence. As quickly as the roof sheathing is gotten rid of, the rest of the aspects canbe removed. Time is of the essence when it comes to getting rid of a roof.