Preparation a Second Story Addition

Posted on: December 25, 2021 by in Uncategorized
No Comments

Preparation a Second Story Addition

When dealing with a job that includes eliminating your roof, Planning is the technique.
Prior to you prepare your 2nd story, research study what barriers will require to be handled. Examples of products that require to be looked after are:
– Size of ceiling joists, can they support a 2nd story flooring covering?
– Are mechanicals run over the top of existing ceiling joists? (pipelines, electRic, HVAC).
– How much overhang is on existing roof and exist any energies secured to it.
– Is the existing roof stick developed( developed on website) or a truss roof( made).
– Is the roof sheathing 1x boards or plywood?
– How lots of layers of shingles exist?
– Are there any Stacks or flues extending through the roof such as a fireplace chimney, heating system flue, or vent pipeline.
These things require to be thought about so the addition can be developed as rapidly as possible.
When beginning the tearoff, the actually very first thing that requires to be addressedis the soffit. Eliminating this at initially will release up the rafter ends when it comes time to eliminate them.
Now you can tearoff the roof. The most problem-free method to eliminate the shingles and sheathing is with a circular saw. It’s finest to utilize an old blade with a lower quantity off teeth due to the fact that it will be garbage when you are done.
When cutting the roof away, begin at the ridgeboard and run the saw in between the rafters all the method to the rafter tails. Repeat this cut every 32″ from one end of the roof to the other. These pieces, presuming they are plywood, can be gotten rid of in 32″ x 48″ squares.
If the roof sheathing is pieces, the cuts need to be made 48″ to 64″ apart. You need to be able to roll these areas down the rafters if there are 2 or mre layers of shingles.
When the roof sheathing is gotten rid of, the rest of the elements canbe gotten rid of. When that is gone the rafters can be gotten rid of.
After the sheathing is removed, a variety of the truss work will require to be removed. The only part left would be the bottom cable that holds up the drywall ceiling. Each circumstance is many and what is utilized is spect by an engineer or designer.
The electrical (chance), pipelines and/or HVAC run over the top of the ceiling joists. Generally, the most convenient method to manage this, is to develop a knee wall high enough for the brand-new flooring covering joists to clear these blockages.
As rapidly as the deck is down, the walls, ceiling joists, and roof of your brand-new addition can follow.
Whatever circumstance may you have, exceptional preparation will make this taskeasier and quicker. When it comes to getting rid of a roof, Time is of the essence. You wish to protect the existing structure and all of your vital possesions that are left within.
( c) 2005 Mike Merisko www.sawkerfs.com.

As rapidly as the roof sheathing is eliminated, the remainder of the elements canbe eliminated. When it comes to getting rid of a roof, Time is of the essence.

When it comes to getting rid of a roof, Time is of the essence. Time is of the essence when it comes to getting rid of a roof.

When cutting the roof away, begin at the ridgeboard and run the saw in between the rafters all the technique to the rafter tails. Time is of the essence when it comes to getting rid of a roof. When it comes to getting rid of a roof, Time is of the essence. As rapidly as the roof sheathing is gotten rid of, the rest of the elements canbe gotten rid of. Time is of the essence when it comes to getting rid of a roof.